May 3, 2012 - Board of Adjustment Agenda - Home

May 3, 2012 - Board of Adjustment Agenda

Date: May 2, 2012

TOWNSHIP OF TEANECK

BOARD OF ADJUSTMENT

THURSDAY –  MAY 3, 2012

COUNCIL CHAMBERS

MUNICIPAL BUILDING

 

 

 

 

PLEDGE OF ALLEGIANCE

 

ROLL CALL

 

PUBLIC SESSION - 7:00 P.M.

 

MINUTES

 

MEMORIALIZATION OF RESOLUTIONS  - None

 

CONTINUED HEARING

OLD BUSINESS -

1.  ZB2011-37 – State Corner, LLC – C/O Rafael Levy – (Matt Capizzi, Esq.) – 140 State Street – Block #5004 – Lot 1 – B/1 Zone

Application seeks the construction of a 6 story residential/retail mixed use building with underground parking. Variance required: Site plan.

Date of application: 07/13/11 – Plans deemed complete: 08/08/11 – 120 days: 12/16/11

This applicant’s attorney requested that this application be carried to this meeting to set the date of 5/17/12 for continuation of the appeal.

Engineer’s plans dated: 01/5/12 & architect’s plan dated: 1/9/12.

2. ZB2011-51 – 1475 Realty Associates, LLC – (Gregory K. Asadurian, Esq.) – 1475 Palisade Avenue – Block #5001 – Lot 3.01 – L/I Zone

Applicant seeks the construction  of a two story medical office building with underground parking. Variances required: Site plan approval, Use, building coverage, lot coverage, parking & fences & retaining wall.

Date of application: 10/4/11 – Plans deemed complete: 12/28/11 – 120 days: 4/26/12

Revised letter of refusal dated: 04/23/02 – revised site plan dated: 4/9/12

3. ZB2012-05 – Peyser, Seth –1302 Dickerson Road – Block #2102 – Lot 14 – R/S Zone

Applicant seeks the construction of a rear two story addition. Variance required: Nonconforming, building coverage & lot coverage

Date of application: 01/12/12 – Plans deemed complete: 02/12/12 – 120 days: 06/11/02

Revised site plan dated: 12/5/11 – Survey dated: 05/19/04

4 . ZB2012-07 – Razzaq, Abdul – (Lewis Reicher, Esq.) - 555 Glenwood Avenue – Block #4302 – Lot 4 – R/S Zone

Applicant seeks the conversion of an existing single family dwelling into a two family dwelling.

Variance required: Use

Date of application: 2/6/12 – Plans deemed complete: 2/16/12 – 120 days: 6/15/12

 

Architects plan dated: 9/27/11.

NEW BUSINESS

1. ZB2012-06 – Corio, Marie Rose – 562 Churchill Road – Block #1803 – Lot 20 – R/S Zone

Applicant seeks the installation of a 17-20 kilowatt emergency generation. Variance required: Side yard width.

Date of application 02/01/12 – Plans deemed complete; 02/12/12 – 120 days: 06/01/12

Date of survey: 05/25/79 and submitted date: 1/25/12

2. ZB2012-11 – Dukas, Richard & Gail – 310 Johnson Avenue – Block #2406 – Lot 9 – R/S Zone.

Applicant seeks the installation of a 20 Kilowatt emergency generator. Variance required: Side yard width .

Date of application: 02/27/12 – Plans deemed complete: 3/7/12 – 120 days: 7/5/12

Survey dated: 07/07/10

3. ZB2012-12 – Alt, Howard & Elaine – 200 Chadwick Road – Block #3005 – Lot 5 – R/S Zone

Applicant seeks the construction of a two story front yard addition & expand front driveway.

Date of application: 3/6/12 – Plans deemed complete: 3/14/12 – 120 days: 7/12/12

Site plan dated: 2/14/12

This application will be carried to the meeting of 06/07/12 to notice the utilities.

4. ZB2012-13 – Fleichman, Jonathan & Laura – 691 Camperdown Avenue – Block #1713 – Lot 6 – R/S Zone

Applicant seeks the construction of a patio & pergola in the side yard. Variance required: Side yard width & limitations of side yard paving.

Date of application: 3/20/12 – Plans deemed complete: 4/2/12 – 120 days: 7/31/12

This is a corner property.

5. ZB2012-14 – Tadiello, David E. – 586 Tilden Avenue – Block #603 – Lot 12 – R/S Zone

Applicant seeks the construction of a two story rear yard addition & shed. Variances required:

Side yard width, combined side yard width & building coverage.

Date of application: 3/20/12 – Plans deemed complete: 4/12/12 – 120 days: 8/10/12

Architects plan dated: 1/24/12

6. ZB2012-15 – Combs, Issac – 1728 Clinton Place – Block #5206 – Lot 22 – R/S Zone

Applicant seeks to replace chain link fence with 6’ PVC fence on an angled thru lot. Variances required: Fence height & fence visibility.

Date of application: 3/22/12 – Plans deemed complete: 4/11/12 – 120 days: 8/9/12